In the shadows of the mammoth NRG Energy Inc. plant off Point Drive North in Dunkirk is a $46.5 million investment by National Grid to disconnect its ...
In making the improvements at the Dunkirk station, Wiley noted the older equipment was built to last for decades. However, with New York state pushing for more alternative and cleaner energy options such as wind and solar, it ultimately led to the end of the more than 70-year-old facility. Previously known as Niagara Mohawk, the plant both produced and distributed power throughout portions of the northeast.
In the shadows of the mammoth NRG Energy Inc. plant off Point Drive North in Dunkirk is a $46.5 million investment by National Grid to disconnect its ...
In making the improvements at the Dunkirk station, Wiley noted the older equipment was built to last for decades. However, with New York state pushing for more alternative and cleaner energy options such as wind and solar, it ultimately led to the end of the more than 70-year-old facility. Previously known as Niagara Mohawk, the plant both produced and distributed power throughout portions of the northeast.